毕业设计外文翻译题 目 跨 越 世 纪 之 桥专 业 土木工程(桥梁) 班 级 2007级3 班 学 生 陈 博 指导教师 刘 东 重庆交通大学 2011年6月A Bridge For All CenturiesAn extremely long-and record setting-main span was designed for the second bridge to across the Panama Canal in order to meet the owners requirement that no piers be placed in the water.Because no disruption of canal traffic was permitted at any time,the cable-stayed bridge of cast-in-pla