1、模具常用英语!2008 年 09 月 12 日 星期五 15:56模具英语句子1 XXX!你现在有空吗,我可以问你一些问题吗? Could I ask you some questions if you are free? / Are you free now? May I ask you some questions (a question)?2 请问此产品的面是否为外观面?表面做什么处理?是晒纹/抛光? Can you tell me whether the surface of this part is a visible/esthetic one? What will we do fo
2、r its surface? Texture or Polishing ?3 请问产品这个面可否加顶针或顶块?产品允许加扁顶针吗? Does this part need an ejector pin or an ejector bar? Can we add an ejector blade?4 这个产品的柱位我们打算做司筒。(或镶针)可以吗? Can we add ejector sleeves or ejector pins in the boss of this part?5 产品的这个位置不能出模,我们打算做行位,在此面上会有分模线,你接受吗? Theres an undercut
3、at this position and it needs a slider. It will also have a parting line on this side, is that OK?6 产品里面的这个位置我们打算做斜顶或内行位,有问题吗? We will make the lifter and (inner) slider in this position, will that be a problem?7 你提供的 2D 产品图与 3D 产品图不一致,请问以哪一个图面为准? The 2D and 3D drawing you provided is not the same,
4、can you tell me which one is correct?8 你提供的 3D 产品图有的地方没有出模角,有的地方胶位太厚,有的地方胶位太溥,这些产品问题我们可以自己修改吗?修改后会给交给你确认。 There is no draft angle in the 3D drawing, some materials are too thick, and some place are too thin. Can we modify this part by ourselves? We will send the drawing to you for you to check after
5、 we modify it.9 按你们提供的缩水率千分之五,这个模具的尺寸已经做到了模具图面要求。但注塑出来的产品不符合你们的产品图。请确认你们的材料的缩水率是否正确? According to the shrinkage one over two hundred, the mold has been done in the right dimension, but the part falls short to your part drawing, are you sure the shrinkage is right?10 产品的这个位置太小,导致模具钢料太溥,能够加宽这个位置吗? Thi
6、s position is too small and will make the steel material here too thin, can we widen it here?11 斜顶与后面的柱位空间太小,斜顶在运动时会干涉到柱子,能移动这个柱子的位置吗? The angular lifter interferes with the boss during ejection. Please consider changing the position of the boss.12 这个筋骨位胶厚太溥,而且高度偏高,注塑时很难填充这个筋位,可以增加这个筋骨位的厚度吗?The rib
7、here is too thin and on the high side, so it will be difficult to fill here when we do the injection, can you increase the thickness of this rib?13 你是想将此筋骨位的高度加高/减低吗?加胶的位置我们将用铜公放电加深。但减胶的位置有两种做 法,1、做镶件;2、烧焊;因为镶件的底部有运水,我们简单的做法是烧焊处理,你可以接受吗?Will you increase/decrease the material on this rib? We will us
8、e EDM if you add material, but there are two option if you choose to decrease: 1. Make inserts;2 Welding, because there is water in the bottom of the insert, is that OK?14 这个样板的筋骨位底部烧焦,是因为排气不良,我们可以在筋骨位的中间增加一个镶件。 This sample has been burned in the bottom because the venting is not good, we can add an
9、 insert in the middle of the rib.15 重做镶件大约需要 5-6 天时间,你能接受吗? It will take about 5 or 6 days to redo the insert, is that OK?16 产品的这个面我们已经做了晒纹处理,如果需要加胶,这个面我们需要重新外发晒纹。可能需要几天的时间。所以我们直接以铜公放电的火花纹取代你要求的纹路,你可以接受吗? We have made the texture on this side, if we add material, it will take some days to remake the
10、 texture by out-resourcing, so we suggest using the texture by EDM instead, is that OK?17 模具是用公制/英制的配件?需要备用件吗? Is this mold dimension measured in inches or meters? Does it need spare parts?18 模具上铭牌上的刻字内容是由你们提供吗?你们什么时候可以这些刻字资料。 Will you provide the engraving content of the plate of this mold to us? W
11、hen will you send it?19 可否提供此模具生产时,注塑机的型号及相关资料。如:啤机大小、呵林柱尺寸、顶棍孔尺寸等 Can you provide the type of injection machine and other related information of this mold to us? Such as the boss dimension, the holes dimension of the ejector pin and the size of the injection machine and so on.20 这个问题我需要同其它同事商议会再答复你
12、。 I need to discuss this problem with the other colleagues and then I will reply back to you.21 我们将尽力达成你的计划,如有异常,会及时通知你。 We will try our best to complete your plan, if there are any complications, we will notify you immediately.22.这个产品的长度为 330.12MM,宽度为 78.96MM,高度为 45MM.胶厚为 2MM,重量为 70.63g,试模注塑机型号为 25
13、0 吨,胶料颜色为黑色,产品外表面晒纹处理,内表面为抛光.需要日期章、环保章、材料章.前后模用 2344 氮硬,斜顶和行位座用 738H,以上模具信息正确吗?请确认! “The length of this part is 330.12MM, Width is 78.96MM, height is 45MM, thickness is 2MM, weight is 70.63g, the injection machine is 250T, the material is black, the outside of the part has texture, inner side needs
14、polishing, and it also needs a date and recycle stamp ,the core otherwise, the lead-time will be extended.)38. 此面是否有特殊要求,能否有頂針印 (Please confirm whether it is a critical surface or not and if we can have E.J. pin marks on it.)39. P.L 面開在此處,模具上會有尖角和刀口,對模具壽命有影響 (There are sharp edges if we set the part
15、ing line here, It will reduce the tool life)40. 加大拔模角,以便脫模順利 We suggest enlarging the draft angle to help release the tool.)41. GATE 做在此處的話有兩個缺點:1.蓋子打開時可以看到 GATE 的修剪部位; 2.兩個斜銷在同一側,頂出也不是很平衡. (There are two problems if the gate is to be designed in this area: a). It is easy to see the gate mark when y
16、ou open the cap. b). The ejectors are unbalanced when two lifters are on the same side)42. GATE 做在此處的話.蓋子打開後看不到 GATE 的修剪部位 (The gate mark is not visible if the gate position is designed like this.)43. 如果 GATE 一定要做在你們指定的位置的話,那還不如做在這一側,這樣的話還可以減小這個位置的縮水 “(If you insist that the gate position has to be
17、like the original design, then we would further recommend to have it to the area indicated so it can avoid a shrink problem in this area.)“44. 在此處 GATE 做潛頂針的話,背後的外觀面會有沖料痕,而且成品又是黑色的,會最明顯 (If the design of the gate has to be a sub. Gate, then the back surface of the part will have serious flow marks d
18、ue to the black color.)22. P.L 開在此處不合理,模具加工困難,P.L 應改為和圖示的一樣 “(This area is not suitable to have a Parting line because the tool will become more complicated; therefore, we recommend to have the Parting line as indicated.)“45。产品粘母模的機會很大,能否在公模加倒勾,拉料頂針或者公模保留 E.D.M 紋,開模時使成品留在公模一側 “(There is possible sti
19、cking on cavity; therefore, please confirm whether it can make undercuts, snatch pins or leave coarse E.D.M. on the core to snatch the part on) “46.此處料厚段差很大,成品表面會有應力痕,是否接受 (Please confirm whether it is acceptable to have stress lines on the surface because the thickness is not equal.)47. 請注明何處為外觀面,能
20、否提供 2D 圖和注意事項 (Please advise where the critical surface is. Please also provide us a 2D drawing with critical dimensions. )48. 紅色所示處是有問題的地方,請特別注意 (Please note the red highlights because those areas have problems.)49. 成品設計此處有問題,建議如下圖所示修改 (We would suggest using the attached part design as the current
21、 design has problems.)50. 此處改為一個球形的凹槽 (We suggest modifying it as a globe recess.) 51. 圓柱特征要有一半不可以拆在滑塊裡,以防拉斷 (this issue is the same as no.31)52. 此處大滑塊上走小滑塊,小滑塊要先退,大滑塊要做延遲(The inside small slide block will recede first and the parent slide block have to postpone sliding.)53. 滑塊要用液壓油缸抽芯以保証開合模順序 (The
22、slide pins will use an oil cylinder to assure that the process is in proper order.)54. 這個面有裝配,加料的話裝配時會頂住,如圖所示“(We cannot add material to this surface because it will intervene between the two parts when it is assembled. Please see the sketch attached. )“55. 可降低斜銷面,增加成品些許肉厚來做變化(To descend the surface
23、 of lifter in order to thicken the part.)56. 一半做斜銷,一半做自然 (One half side will have the lifter and the other half will be solid/nature.)57. 此處兩個柱子重疊,有倒勾,不能做自然,要做 SLIDE“(These two bosses are overlapping with undercut therefore it can not be made as solid. Wesuggest making it with a slide block.)“58. 此處
24、強迫頂出 (This area needs force ejection.)59. 公模兩段開模,這個地方先退 (Here will be a double ejection for forward and receding.)60. 此處做鑲件會有夾線,能否接受 Please confirm whether it is acceptable that there will be a split line here.)61. 此面公母模 1 度靠破,會有段差,可否接受(Please confirm whether it is ok to have mismatch to the area wh
25、ere there is 1 degree of shut off in Core / Cavity side.)62. 這個尺寸能否加大 (Please confirm whether we can enlarge this dimension.)63. 此處加一個凹槽,膠片的彈出效果會更好一些,試模後看裝配的效果再做修正“(It will affect the elastic of the film better if we add a recess. See how it will affect the assembly parts, and then make your decisio
26、n.)“64. 此處有倒勾,建議將剖面線所示部位 CUT 即可避免此處的倒勾(There is an undercut here, we suggest cutting out the indicated part as it highlighted to avoid an undercut.)65. 成型後 SUB GATE 要修平(The gate (sub gate) needs to be trimmed evenly after being moulded.)66. 此處倒勾先垂直頂出,之後再手動取出(This area of the undercut needs to be eje
27、cted vertically, then taken out manually.)67. 這兩個面都有滑塊,GATE 改在此處改不到(The gate is not suitable in this area because there are two sliding blocks sealing off this area.)68. 此處加做一個旋轉 GATE,射出時方便調整成品的品質(We would suggest placing a runner shut-off insert to adjust the volume of part filling.)69. 此倒勾在滑塊上強迫脫模
28、,倒勾是否可以減小到 0.6(This undercut will be force ejected out, Please confirm whether it can be reduced to 0.6 mm.)70. 此柱子無法脫模,請確認是否是在轉圖時錯位,能否提供客戶的原始圖檔 data. )(This boss is not releasable. Please check the file again and if possible, pleas re-send us the original draft71. 此柱子是實心的,會縮水 (This boss will shrink
29、 because it is a solid boss.)72. 這個面是否要咬花,咬花番號是什麼,最小的拔模角要多大(Please confirm whether this surface needs to be textured or not. Please advise texture specs. Also, whats the min. draft. )73. 這個面是否要打光,貼標簽(Please confirm whether this surface needs to be polished and stuck on a sticker.)74. 紅色顯示的幾個面拔模角太小,出
30、模時會拉傷,建議加大拔模角“(The red highlighted area has a problem of a small draft angle. We suggest enlarging thedraft to avoid causing drag marks on the part.)75. 此 RIB 太薄,會填充不足 (This rib can not be filled properly because it is too thin.)76. 此 RIB 太厚,會縮水 (This rib will have a shrink problem because it is too
31、 thick.)77. 此處倒勾出模困難,建議先不做倒勾,成型後再二次加工,但要做治具,費用要另外算(There are problems with this current design, we recommend doing this undercut as an alternative but there will be additional costs.)78. 柱子底部都要做火山口(The base of all bosses require a crater to avoid shrinkage.)1.镶件,P.L.面有充足排气坑,P.L.面要开环形排气槽,并能将气体排到模外。In
32、sert/PL should have adequate venting, PL should have around slot for venting.79.顶棍孔镶件端面距离底板面 0,5mm,攻 m20 牙;the surface of KO insert should below bottom plate 0.5mm,thread M20.80.回针,中托司与模胚部份避空 0.5mm;RP,EGP should have 0.5mm gap with the moldbase.81.排气槽距封胶位 10-15mm;Venting slot distance from the seal
33、off position 10-15mm82.运水进用 E ,运水出用 S ;In take “E“, Out take “S“83.底面板均要有隔热板,DME 规格 1/4 厚;Top/Bottom plate must have insulator plate, DME standard 1/4H84.吊环要在模具的重心(保证吊模时的平衡);Eyebolt should on the center of the mold(for balance)85.吊模螺丝的位置要在前/后模部份的重心,保持平衡;The eyebolt position on the cavity/core side s
34、hould on the center of gravity for balance86.唧嘴分试模唧嘴/走模唧嘴;Sprue type: Trial/Delivery87.喉塞选用:NPT 规格;Plug use NPT spec.88.中托司采用 HASCO 滚珠形式. Use HASCO ball EGP89.水咀采用法国标准:1/4“的水咀写:RPL08-1151Jiffy Use French Standard: 1/4“ mark:RPL08-115190.全部使用英文和英制单位 All in English self-degating whenever possible.142.
35、模具必须稳定位置如有凸出物请加脚座,是否完成?No obstructions on bottom surface of mold?143.模坯长宽和模厚(模架的长宽)Overall mold size of the moldbase & shut height144.出入水位有否打上 IN 、OUT 字码?Outlets accessible and marked “ IN OUT and NUMBER“?145.画出突出部件并做好保护。Protruding items shown and protected。Parting line at the acceptable surface.合模分
36、布在合理可接受的表面。Put waterline as much as possible/wherever possible。尽可能布置多的运水。Put waterline for slide /lifter/insert wherever possible.尽可能在行位、斜、镶件布置运水。Parting line cleared and released properly?分模线是否正确?101.模具须用多大吊机才可搬动 Crane capacity and loading clearance.。102.经流道及变形电脑模拟分析。Conduct mold flow &mold warp analysis.103.散件图或 3D 模具图 Component and/or 3D mould design drawing.104.若尺寸不重要,适量冷却也可。Cooling less important when dimensions are not important.105.将一个标准四模腔大水口模具与一个四模腔倒转大水口模具结合成为一套可于同一大小的注塑机,生产量可增加一倍的层板模具,并且可降低成本。