ImageVerifierCode 换一换
格式:DOC , 页数:3 ,大小:30.50KB ,
资源ID:3216174      下载积分:20 文钱
快捷下载
登录下载
邮箱/手机:
温馨提示:
快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。 如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝    微信支付   
验证码:   换一换

加入VIP,省得不是一点点
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【https://www.wenke99.com/d-3216174.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: QQ登录   微博登录 

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(科技英语 小论文 HYPERLINK.doc)为本站会员(11****ws)主动上传,文客久久仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知文客久久(发送邮件至hr@wenke99.com或直接QQ联系客服),我们立即给予删除!

科技英语 小论文 HYPERLINK.doc

1、 Comparative analysis of the Public works construction managementAbstraction:There are some advantages and disadvantages during the traditional mode of public works construction management, building center and construction agent in public worksKey word:public work,management.Traditional construction

2、 management mode can make a solid foundation for the carrying out of the projects, and that is because the government plays an important role in public works and they have a good cooperation. In the other hand, the owner status is unclarity under this mode, moreover, it also brings out trouble water

3、s in management and will have bad influence in supervision mechanism. In the background of the mode, the project management is backward and the risk aversion mechanism is not perfect, the investment benefit and social benefit for the government is not perfect. First, building center mode is realizin

4、g the centralized management, making the main responsibility clear, and resolving the problems in the phenomenon of the absence of specific oversight of the government investment projects, it can help preventing corruption, which brings out a certain degree of centralized management. There are a num

5、ber of professional and professionals and technical will be trained well. Compared with traditional construction management, “achievement projects“ undertake a government investment projects, and carry out by the planning department, the formulation of the base bid and the contracts must be reviewed

6、 by the audit department. The project bidding including the bidding units prequalification must accept the supervision of the City Construction Bureau. And the project funds are paid directly by the Bureau of Finance, and accept the supervision of it. It can be said that, the construction center is

7、to be responsible for the quality, safety, and duration of construction projects, it has no right to control i the other key issues. Especially the implementation of fiscal consolidation pays for projects uniformly, and that makes “the construction of the center“ become a veritable “blank checks“. E

8、ngineering construction center just invest on his behalf, it did not solve the problem of the role of government confusion completely. There is no better incentive and monitoring mechanisms for it, lacking of initiative of the constraints investment cost makes construction of the center establish to

9、 increase the government establishment and financial burden, With the increasing in government investment, the construction center will be at a loss, and it will be limited by the subject to the annual scale investment.Secondly, construction agent in public works can play its role of social intermed

10、iary institutions and professional management well. Because it is a model for phase separation Agent Unit and use units, which is the further deepening of the reform of the investment system and agrees with the reform government investment project management mode principles. Because of the relations

11、hip between the agent and the principal, the construction agent has the responsibility of exercise investment as a non-government organization and is responsible for government, it also can strengthen budget constraints, the professionals were involved in the preliminary design stage and they partic

12、ipated in the whole process in the management. Although, the pre-management fee was increased, the effective of investment constraints and controlling investment is available. The disadvantage of it is the supervision of the government at this stage indirectly, and it may even be weakened, and at th

13、e same time, the efforts of construction management and coordination were weakened, which may create some bad influence in public works. In most cases, the project bidding project management company is responsible for producing the phenomenon of runaway government investment. At present, the various

14、 oversight mechanisms at this stage is not perfect, which may lead to a bad phenomenon of running out of control of working management.The mode of management was intervened by government can resolve the financing problem, it can help clear the main part of investment responsibility.The relationship

15、between agent and principle can not control the management well. Through this way, the government can get more social funds and helping absorb social funds and expanding the financing channels for government investment projects. Compare with foreign government project management mode, it can be foun

16、d that the creation of specialized management agencies of the government investment projects in Hong Kong, such as Works, centralized and professional management, are more appropriate. the establishing of public works construction center also base on the real practice. In Britain, they set up the go

17、vernment projects according to their specific nature and adopt different management mode. Through the analysis, it can be found that Britain supports to establish some independent mechanism to invest and use land. Though the institutions responsible for works is setting up wholly owned by the govern

18、ment, the management, such as financing, inviting public bidding, daily operation, and other projects about management. In foreign countries, they usually adopt the management mode of private engineering, and it also named BOT, that is because the public works can get a steady return of investment.

19、For the projects invested by government, they take the special government agencies to realize, the management of this is closed management, self-organized construction and management. For construction system, take Singapore as an example, the owners of projects entrusted to engineer consulting firm

20、(usually a design company) to carry out the project feasibility studies, architectural design, structural design, construction bidding, construction supervision and final acceptance. . This is the CM mode. Pure industry management behavior plays a government role of guidance, coordination, service,

21、and supporting, it doesnt involve the internal management of construction enterprises, and it does not other investment activities directly. In fact, it is an indirect management industry, which can be used in the developed countries with legal system. Due to the weakening of the governments control

22、 over present stage, it is not suitable for Chinas national conditions.Generally speaking, there are three forms for foreign public works management. The first one is that the government set up institutions to self-built and self-direct management; next is adopting the BOT model, CM mode to self-manage indirectly. And the last one is taking the government and professional institutions manage together, and it should play the governments coordination, control ability. In a word, it can be a good management mode to play its advantages well.

Copyright © 2018-2021 Wenke99.com All rights reserved

工信部备案号浙ICP备20026746号-2  

公安局备案号:浙公网安备33038302330469号

本站为C2C交文档易平台,即用户上传的文档直接卖给下载用户,本站只是网络服务中间平台,所有原创文档下载所得归上传人所有,若您发现上传作品侵犯了您的权利,请立刻联系网站客服并提供证据,平台将在3个工作日内予以改正。