1、摘 要本论文主要包括施工组织设计和概预算设计两个方面。本设计选择的是一栋 18 层的框架-剪力墙结构。施工组织设计方面主要阐述了水木融城 2#楼的工程建设概况、工程特点以及施工合同条件、现场条件、法规条件、施工方案、施工进度计划表、施工准备工作、冬雨季施工要求、施工平面布置图、施工组织管理措施等内容,并做出了详细的施工方案和工程量计算。概预算设计部分详细的计算出了建筑的投标总价,投标报价说明等。设计计算整个过程综合考虑了项目的经济性和施工的可行性,并做出了详细的单位工程汇总表。分部分项工程汇总表、分部分项工程量清单与计价表以及分项工程清单项目费汇总表等内容。关键字:施工组织设计;概预算设计AB
2、STRACTIn this thesis, including the construction organization design and budget estimate two aspects of the design. This design choice is a 18-story frame - shear wall structure.Construction organization design is mainly on the financial city Mizuki # 2 floor construction overview, engineering chara
3、cteristics and conditions of contract construction, site conditions, regulatory conditions, construction program, construction progress schedule, construction preparation work, the winter rainy season, construction requirements, the construction plane layout, construction organization and management
4、 measures and other content, and make a detailed construction plans and engineering calculation.Detailed budget estimate to calculate the design part of the buildings total bid, tender offer descriptions. Design calculations took into account the whole process and the projects economic feasibility o
5、f construction and engineering unit made a detailed summary table. Part of the project summary, sub-part of the project lists and pricing tables and sub-project summary list of project costs and other content.Keywords: construction design; design budget estimate目 录1 施工组织设计部分1.1 工程概况及施工条件分析011.1.1 工程
6、概况011.1.2 施工条件分析021.2 施工方案061.3 施工进度计划表101.4 各项资源需用量计划111.5 施工准备工作计划131.5.1 施工准备工作131.5.2 冬季施工要求131.5.3 雨季施工要求141.6 施工平面图布置151.6.1 施工机械设备的布设151.6.2 施工场地及施工临设的安排151.6.3 施工用水用电管理151.6.4 施工平面布置图161.7 施工组织管理措施161.7.1 PDCA 管理办法161.7.2 降低成本的措施181.7.3 文明施工措施201.7.4 安全生产措施211.8 主要技术经济指标232 工程预算部分2.1 投标总价242.2 编制说明252.3 单位工程费汇总表262.4 分部工程清单项目汇总表272.5 分部分项工程清单与计价表282.6 措施项目费汇总表392.7 主要材料设备价格表422.8 分项工程清单项目费汇总表432.9 综合单价计算表652.10 钢筋统计汇总表712.11 楼层构件类别直径汇总表72 参考文献73致谢74