摘 要:文章根据冷再生施工现场的管理及工艺流程,对冷再生的施工现场管理及施工要点、含灰含水量控制、施工碾压、雨季施工等各工序进行了论述。 关键词:冷再生施工;现场管理;工艺流程;施工要点 Abstract: The article according to the cold regeneration job location the management and the technical process, to the cold regenerations job location management and the construction main point, including the ash water content control, the construction roller compaction, the rainy season constructed and so on various working procedures to carry on the elaboration. Key words: cold regeneration