1、relationship, established equivalent relationship 14, and subject: application problem (4)-scores and percentage application problem review content overview answers scores, and percentage application problem of key is: according to meaning, (1) determine standard volume (units “1“) (2) find associat
2、e “volume rate corresponds to“ relationship, Then in-line solution. Category fraction multiplication word problem score Division applications engineering problem problem XV, a subject: review of the measurement of the amount of capacity, measurement and units of measurement of common units of measur
3、ement and their significance in rate 1, currency, length, area, volume, unit size, volume, weight and rate. (Omitted) 2, commonly used time units and their relationships. (Slightly) with a measurement units Zhijian of of poly 1, and of method 2, and poly method 3, and of method and poly method of re
4、lationship measurement distance of method 1, and tool measurement 2, and estimates 16, and subject: geometry preliminary knowledge (1)-line and angle review content line, and segment, and Ray, and vertical, and parallel, and angle angle of classification (slightly) 17, and subject: geometry prelimin
5、ary knowledge (2)-plane graphics review content triangle, and edges shaped, and round, and fan axisymmetric graphics perimeter and area combination graphics of area subject : Preliminary knowledge (3)-review of solid content category 1-d shapes are divided into: cylinder and cone 2, column is divide
6、d into: cuboid, square 3, cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1, size 2, table .和公路施工组织与概预算期末复习题一、 填空题1. _工序_是施工组织设计的最小要素。 2.B 工作在 A 工作完成之后开始,B 是 A 的_紧后_工作, A 是 B 的_紧前_工作。3. 劳动定额的两种表现形式分别是_ 时间定
7、额_和_ 劳动定额_,这两种表现形式之间的关系是_互为倒数_。4.直接费包括直接工程费_、其他工程费_。5. 材料预算单价包括_原价_ 、_运杂费 、_场外运输损耗费_、_采购及保管费_以及回收金额。6.初步设计阶段编制的造价文件是_ 概算 _,编制的技术经济文件是_施工方案_。7.双代号网络图中表示工作的是_箭线_。8. 行车干扰费的计算基数是_人工费 和 机械费 _。9施工时间组织基本作业方法有 _ 顺序作业法_ 、_ 平行作业法_ 、_ 流水作业法 _ 。其中最科学的作业方式是_ _流水作业法 _ 。10.双代号网络图的三要素是_ 箭线 _ 、_节点 _ 、_线路 _ 。11.台班单价由
8、_ 不变费用 _和_ 可变费用 _组成。12.施工进度计划的检查与调整的内容包括_ 施工工期 _和_ _劳动力是否均衡_。13.双代号网络计划图中允许有_ 多 _条关键线路。14.规费的计算基数是_ _人工费 _。15.网络计划技术按表示方法分为_ 单代号网络计划图 _和_ _双代号网络计划图_。16施工过程组织包括:_时间组织和_空间组织两方面的问题。17网络计划的优化内容包括_工期优化_ 、_费用优化_ 、_资源优化_ 。18直接费由_人工费、_材料费和_机械使用费组成。19公 路 建 设 的 内 容 是 小 修 与 保 养 、 大 中 修 与 技 术 改 造 、 公 路 基 本 建 设
9、。20流 水 施 工 组 织 中 的 流 水 又 分 为 : 全等节拍流水;成倍节拍流水;分别流水;无节拍流水。二、单选题(每题 2 分)1公路公路工程机械台班费用定额135kw 以内推土机履带式不变费用 311.14 元、人工 2 工日、柴油65.37kg、人工 52.42 元/工日、柴油 8.5 元/kg,则其台班预算单价为( C )元。A、729.85 B、867.13 C、971.625 D、1352. 某老路改建工程机械土方 10000m3,雨季施工增加费费率为 2.0%,行车干扰施工增加费费率为 4.0%,relationship, established equivalent r
10、elationship 14, and subject: application problem (4)-scores and percentage application problem review content overview answers scores, and percentage application problem of key is: according to meaning, (1) determine standard volume (units “1“) (2) find associate “volume rate corresponds to“ relatio
11、nship, Then in-line solution. Category fraction multiplication word problem score Division applications engineering problem problem XV, a subject: review of the measurement of the amount of capacity, measurement and units of measurement of common units of measurement and their significance in rate 1
12、, currency, length, area, volume, unit size, volume, weight and rate. (Omitted) 2, commonly used time units and their relationships. (Slightly) with a measurement units Zhijian of of poly 1, and of method 2, and poly method 3, and of method and poly method of relationship measurement distance of met
13、hod 1, and tool measurement 2, and estimates 16, and subject: geometry preliminary knowledge (1)-line and angle review content line, and segment, and Ray, and vertical, and parallel, and angle angle of classification (slightly) 17, and subject: geometry preliminary knowledge (2)-plane graphics revie
14、w content triangle, and edges shaped, and round, and fan axisymmetric graphics perimeter and area combination graphics of area subject : Preliminary knowledge (3)-review of solid content category 1-d shapes are divided into: cylinder and cone 2, column is divided into: cuboid, square 3, cone cone of
15、 the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1, size 2, table .和建筑安装工程费为元,直接费为元,间接费为 20000 元,人工费 10000 元,材料费 10000 元,机械费70000 元,则行车干扰施工增加费为( B )元。A、2400 B、3200 C、1800 D、27003在网络图中对编号的描述错误的是( D )。A 箭头编号大于箭尾编号 B 从小到大
16、、从左往右编号 C 可间隔编号 D 可以编号重复4.财务费用属于(B)。A、直接费 B、间接费 C、其他直接费 D、施工技术装备费5.公路工程机械台班费用定额中的折旧费、大修理费和经常修理费是属于( C )。A、人工费 B、修理费 C、不变费用 D、可变费用6其他工程费计算基数为( B )A、直接费 B、直接工程费 C、定额基价 D、间接费 7路面人工标线(普通标线)其他工程费及间接费取费标准的工程类别是( C )。A、高级路面 B、其他路面 C、构造物 I D、构造物 II8波形护栏安装其他工程费及间接费取费标准的工程类别是( D )。A、构造物 I B、构造物 II C、技术复杂大桥 D、
17、钢材及钢结构9.一项桥梁项目在竣工验收时,为了鉴定一项隐蔽工程质量,进行了必要挖掘,则该项挖掘费用应计入( B )。A.涨价预备费 B.基本预备费 C.间接费 D.其他间接费10.建设项目的实际造价是( A )。A.竣工决算价 B.承包合同价 C.中标价 D.竣工结算价11.某建筑材料包含包装费的原价是 600 元/吨,手续费、运杂费、运输损耗费等费用是 50 元/吨,采购及保管费率是 2%,这种材料的预算价格是( B )元。A.600 B.663 C.612 D.65012.时间定额与产量定额之间的关系是( A )。A.互为倒数 B.互成正比 C.需分别独立测算 D.没什么关系13.概算造价
18、是指是在( B )阶段,通过编制工程概算文件预先测算和确定的工程造价。A.项目建议书和可行性研究 B.初步设计C.技术设计 D.施工图设计14.预算定额水平与施工定额水平相比( C )。A.相同 B.比较高 C.比较低 D.关系不确定15.根据我国现行建筑安装工程费用项目组成的规定,直接从事建筑安装工程施工的生产工人的福利费应计入( A )。A.人工费 B.规费 C.企业管理费 D.现场管理费16.根据我国现行建筑安装工程费用项目组成的规定,工地现场材料采购人员的工资应计人( B )。A.人工费 B.材料费 C.现场经费 D.企业管理费17.某新建项目,建设期 3 年,第一年贷款 300 万元
19、,第二年贷款 600 万元,第三年没有贷款。贷款在年度内均衡发放,年利率为 6,贷款本息均在项目投产后偿还,则该项目第三年的贷款利息是( C )万元。relationship, established equivalent relationship 14, and subject: application problem (4)-scores and percentage application problem review content overview answers scores, and percentage application problem of key is: accord
20、ing to meaning, (1) determine standard volume (units “1“) (2) find associate “volume rate corresponds to“ relationship, Then in-line solution. Category fraction multiplication word problem score Division applications engineering problem problem XV, a subject: review of the measurement of the amount
21、of capacity, measurement and units of measurement of common units of measurement and their significance in rate 1, currency, length, area, volume, unit size, volume, weight and rate. (Omitted) 2, commonly used time units and their relationships. (Slightly) with a measurement units Zhijian of of poly
22、 1, and of method 2, and poly method 3, and of method and poly method of relationship measurement distance of method 1, and tool measurement 2, and estimates 16, and subject: geometry preliminary knowledge (1)-line and angle review content line, and segment, and Ray, and vertical, and parallel, and
23、angle angle of classification (slightly) 17, and subject: geometry preliminary knowledge (2)-plane graphics review content triangle, and edges shaped, and round, and fan axisymmetric graphics perimeter and area combination graphics of area subject : Preliminary knowledge (3)-review of solid content
24、category 1-d shapes are divided into: cylinder and cone 2, column is divided into: cuboid, square 3, cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1, size 2, table .和A.36.0 B.54.54 C.56.73 D.58.3818.在人工单
25、价的组成内容中,生产工人探亲、休假期间的工资属于( C )。A.基本工资 B.工资性津贴C.辅助工资 D.职工福利费19.某建设项目投资构成中,设备及工、器具购置费为 2000 万元,建筑安装工程费为 1000 万元,工程建设其他费为 500 万元,预备费为 200 万元,建设期贷款 1800 万元,应计利息 80 万元,流动资金贷款 400万元,则该建设项目的工程造价为( C )万元。A.5980 B.5580 C.3780 D.4180 解析:建设项目的工程造价,包括设备及工、器具购置费、建筑安装工程费、工程建设其他费、预备费、建设期货款利息、固定资产投资方向调节税。该建设项目的工程造价=
26、2000+1000+500+200+80=3780(万元)。20、公路施工企业措施费系指施工期间为满足安全生产、文明施工、职工健康生活所发生的费用。按规定该项费用应计入( C )A 规费 B 税金 C 直接费 D 企业管理费21、编制公路基本建设项目概(预)算时,商品混凝土(包括沥青混凝土和水泥混凝土路面)的浇筑应采用(C )的费率计算。A 构造物 B 构造物 C 构造物 D 高级路面22、在编制施工图预算时,当水泥砂浆、混凝土的强度等级与预算定额的规定不同时,根据规定(A )A 允许对其调整 B 不允许调整 C 仅允许对混凝土调整 D 仅允许调整水泥用量23、根据公路工程工程量清单计量规则,
27、借土挖方应按(C )A 天然密实体积 B 压实体积 C 松方 D 混合体积24.布置施工总平面图时,应优先考虑的是(B)。A 搅拌站 B 场外交通道路 C 内部运输道路 D 临时设施25.某施工段中的工程量为 200,安排施工人数为 25 人,每人每天完成 0.8,则该队在施工段中的流水节拍是(B)。A12 天 B10 天 C8 天 D6 天( B )26. “?”是指生产单位数量合格产品所消耗的劳动量标准。A、材料消耗定额 B、时间定额 C、机械设备定额 D、产量定额( B )27 时间定额以工日为单位,除潜水工程、隧道工程外,每个工日的工作时间按照现行劳动规定为“?” 。A、4 小时 B、
28、8 小时 C、10 小时 D、12 小时( C )28 公路工程机械台班费用定额中的折旧费、大修理费和经常修理费是属于“?” 。A、人工费 B、修理费 C、不变费用 D、可变费用( B )29. 概预算费用的组成第三部分费用是指“?” 。A、建筑安装工程费 B、工程建设其他费用 C、设备及工具、器具及家具购置费 D、建设单位管理费( B )30. 公路建设前期准备工作中赔偿村民水稻费用属于“?” 。A、建筑安装工程费 B、土地补偿费 C、工程建设其他费用 D、其他工程费 relationship, established equivalent relationship 14, and subj
29、ect: application problem (4)-scores and percentage application problem review content overview answers scores, and percentage application problem of key is: according to meaning, (1) determine standard volume (units “1“) (2) find associate “volume rate corresponds to“ relationship, Then in-line solu
30、tion. Category fraction multiplication word problem score Division applications engineering problem problem XV, a subject: review of the measurement of the amount of capacity, measurement and units of measurement of common units of measurement and their significance in rate 1, currency, length, area
31、, volume, unit size, volume, weight and rate. (Omitted) 2, commonly used time units and their relationships. (Slightly) with a measurement units Zhijian of of poly 1, and of method 2, and poly method 3, and of method and poly method of relationship measurement distance of method 1, and tool measurem
32、ent 2, and estimates 16, and subject: geometry preliminary knowledge (1)-line and angle review content line, and segment, and Ray, and vertical, and parallel, and angle angle of classification (slightly) 17, and subject: geometry preliminary knowledge (2)-plane graphics review content triangle, and
33、edges shaped, and round, and fan axisymmetric graphics perimeter and area combination graphics of area subject : Preliminary knowledge (3)-review of solid content category 1-d shapes are divided into: cylinder and cone 2, column is divided into: cuboid, square 3, cone cone of the features of cuboids
34、 and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1, size 2, table .和( C )31. 某同学编制桥梁工程施工图预算,施工方案采用 8t 自卸汽车运输人行道板预制构件,计算人行道板预制构件运输其他工程费及间接费取费标准的工程类别应为“?” 。A、构造物 I B、构造物 II C、汽车运输 D、其他路面( A )32. 某工地采用挖掘机、推土机修建一条 6m 宽 1Km 施工便道(无路面) ,其他工程费及间接费取费标
35、准的工程类别为“?” 。A、人工土方 B、机械土方 C、汽车运输 D、其他路面( D )33. 某同学计算桥梁橡胶板式伸缩缝预算,其他工程费取费标准的工程类别为“?” 。A、构造物 I B、构造物 II C、构造物 III D、钢材及钢结构( C )34. 沥青碎石混合料运输其他工程费及间接费取费标准的工程类别为“?” 。A、高级路面 B、其他路面 C、汽车运输 D、构造物 I ( D )35. 碾压混凝土路面基层其他工程费及间接费取费标准的工程类别为“?” 。A、汽车运输 B、构造物 I C、高级路面 D、其他路面( C )36新建公路工程施工图预算不应计取“?”费用。A、直接工程费 B、其
36、他工程费 C、行车干扰费 D、职工取暖补贴( A )3.7 水泥稳定碎石基层设计厚度 30cm 须分层施工,则每 1000m2增加“?”工日。A、3 B、5 C、10 D、15( B )38. 某老路改建工程机械土方 10000m3,雨季施工增加费费率为 2.0%,行车干扰施工增加费费率为 4.0%,建筑安装工程费为元,直接费为元,间接费为 20000 元,人工费 10000 元,材料费 10000 元,机械费 70000 元,则行车干扰施工增加费为“?”元。A、2400 B、3200 C、1800 D、2700( A )39. 厂拌石灰粉煤灰矿渣混合料定额配合比为 5:15:80,生石灰定额
37、消耗量为 15.448t;设计配合比为 4:16:80,则调整后石灰消耗定额为“?”t。A、12.358 B、19.310 C、14.483 D、16.478( B )40. 双代号网络图中的虚工作“?” 。A 不占用时间,但消耗资源 B 不占用时间,不消耗资源 C 既占用时间,又消耗资源 D 占用时间,不消耗资源二、 多选题(每题 2 分)1公路建设项目造价文件有 ( ABCD )A、估算 B、概算 C、预算 D、报价 E、拆迁费2套用工程定额必须查阅 ( ABCE )A、定额说明 B、工作内容 C、定额计量单位 D、人工消耗数量 E、定额小注 3.概算定额的编制依据有(ADE)。A.预算定
38、额B.概算指标C.施工定额D.现行的设计标准规范E.人、材、机的价格relationship, established equivalent relationship 14, and subject: application problem (4)-scores and percentage application problem review content overview answers scores, and percentage application problem of key is: according to meaning, (1) determine standard vo
39、lume (units “1“) (2) find associate “volume rate corresponds to“ relationship, Then in-line solution. Category fraction multiplication word problem score Division applications engineering problem problem XV, a subject: review of the measurement of the amount of capacity, measurement and units of mea
40、surement of common units of measurement and their significance in rate 1, currency, length, area, volume, unit size, volume, weight and rate. (Omitted) 2, commonly used time units and their relationships. (Slightly) with a measurement units Zhijian of of poly 1, and of method 2, and poly method 3, a
41、nd of method and poly method of relationship measurement distance of method 1, and tool measurement 2, and estimates 16, and subject: geometry preliminary knowledge (1)-line and angle review content line, and segment, and Ray, and vertical, and parallel, and angle angle of classification (slightly)
42、17, and subject: geometry preliminary knowledge (2)-plane graphics review content triangle, and edges shaped, and round, and fan axisymmetric graphics perimeter and area combination graphics of area subject : Preliminary knowledge (3)-review of solid content category 1-d shapes are divided into: cyl
43、inder and cone 2, column is divided into: cuboid, square 3, cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1, size 2, table .和4.下列哪些费用属于土地征用及迁移补偿费(ACD)。A.征地动迁费 B.土地清理费C.安置补助费 D.青苗补偿费E.土地使用权出让金5.可以编制夜间施工增加
44、费的工程类别有 ( DE )A、机械土方 B、其他路面 C、构造物 I D、构造物 II E、钢材及钢结构 6.浙江省公路工程施工预算可取特殊地区施工增加费的地区有( CD )A、湖州 B、杭州 C、舟山 D、苍南 E、绍兴7.以下( ABD )属企业管理费。A、财务费用 B、基本费用 C、失业保险费 ( ABC )8. 根据基本建设项目的性质和设计内容不同,工程设计一般可分为“?” 。A、一阶段 B、二阶段 C、三阶段 D、四阶段 E、五阶段( ABCD)9. 基本建设工程可划分为“?” 。A、建设项目 B、单项工程 C、单位工程 D、分部工程 E、其他工程( BD )10直接工程费包括“?
45、” 。A、直接费 B、人工费 C、材料预算价格 D、施工机械使用费 E、 机械安装费( ABE )11.双代号网络图的三要素分别是“?” 。A、箭线 B、节点 C、资源 D、代号 E、线路( ACE )12. 粗粒式沥青混凝土路面施工图预算一般套用“?”定额。A、混合料拌和 B、混合料装车 C、混合料运输 D、卸料 E、摊铺四、简答题(9 分)1.简述工程造价的投资体系以及编制阶段。答:项目建议书和可行性研究阶段-投资估算初步设计-设计概算技术设计-修正概算施工图设计-施工图预算招投标阶段-标底、报价施工准备阶段-施工预算施工阶段-工程结算竣交工验收-竣工决算2定额抽换的条件是什么? 答:进行
46、定额抽换的条件:就地浇灌钢筋混凝土梁用的支架及拱圈用的拱盔、支架。如确因施工安排达不到规定周转次数时,可根据具体情况进行抽换,并计算回收。在使用定额时,混凝土、砂浆配合比的水泥用量,如因实际供应的水泥用量、标号与定额中水泥用量、标号不同时,水泥用量可按预算定额附录二基本定额中的混凝土、砂浆配合比表进行抽换。如施工中必须使用特殊机械时,可按具体情况进行抽换。relationship, established equivalent relationship 14, and subject: application problem (4)-scores and percentage application problem review content overview answers scores, and percentage appli