1、Glossary of Terms术语Glossary of Terms术语AAR: Appearance Approval Report 外观批准报告A/D/V: Analysis/Development/Validation 分析/开发/验证A/D/VDV: ADV Design Validation ADV设计验证A/D/V P date material must be delivered in order to allow a build event to begin. 物料需求日期MSA: Measurement Systems Analysis 测量系统分析MVBns: Manu
2、facturing Validation Build non-saleable 非销售车制造验证MVBs: Manufacturing Validation Build saleable 销售车制造验证NBH: New Business Hold 停止新业务N.O.D.: Notice of Decision 决议通知OEM: Original Equipment Manufacturer 主机客户PAD: Production Assembly Documents 生产装配文件PC&L: Production Control & Logistics 生产控制&物流PDT: Product D
3、evelopment Team 产品开发小组PFMEA: Process Failure Modes and Effects Analysis. It is used to identify potential failure modes associated with the manufacturing and assembly process. 过程失效模式和后果分析PPAP: Production Part Approval Process 生产件批准程序Ppk: Performance index for a stable process 过程能力指数PPM: 1) Program P
4、urchasing Manager, 2) Parts per Million (rejects and returns to suppliers) 1)项目经理 2)每百万件的产品缺陷数PPV: Product & Process Validation 产品及过程验证PQC: Product Quality Characteristic 产品质量特性PR/R: Problem Reporting & Resolution 问题报告及解决PSA: Potential Supplier Assessment, a subset of the Quality System Assessment (
5、QSA) 潜在供应商评审PV: Product Validation 产品验证QSA: Quality System Assessment 质量体系评审QSB: Quality Systems Basics 质量体系基础QTC: Quoted Tool Capacity 工装报价能力RASIC: Responsible, Approve, Support, Inform, Consult 负责、批准、支持、通知、讨论RR: Run at Rate 按节拍生产RFQ: Request For Quotation 报价要求RPN: Risk Priority Number related to F
6、MEA development 风险顺序数RPN Reduction Plan: An action plan that describes what is being done to reduce the risk priority number for items listed in the DFMEA or PFMEA. 降低RPN 值计划SDE: Supplier Development Engineer 供应商开发工程师SFMEA: System Failure Mode and Effects Analysis 系统失效模式分析SMT: System Management Team
7、 系统管理小组SOA: Start of Acceleration 加速开始SORP: Start of Regular Production 正式生产SOR: Statement of Requirements 要求声明SPC: Statistical Process Control 统计过程控制SPO: (General Motors) Service and Parts Operations (通用汽车)零件与服务分部SQ: Supplier Quality 供应商质量SQE: Supplier Quality Engineer 供应商质量工程师SQIP: Supplier Qualit
8、y Improvement Process 供应商质量改进过程SSF: Start of System Fill 系统填充开始SSTS: Sub-system Technical Specifications 子系统技术规范Sub-Assembly / Sub-System: An assembly of sub-components delivered to the SGM main production line for installation to the vehicle as a single unit. Subcontractor: The supplier of a sub-co
9、mponent to a Complex System/Subassembly supplier (Tier 2, 3, etc). 分供方SVE: Sub-System Validation Engineer 子系统验证工程师SVER: Structure Vehicle Engineering Release. 结构车工程发布Team Feasibility Commitment: An AIAG APQP form that is provided with the Request for Quotation. It is the suppliers concerns with the feasibility of manufacturing the part as specified. 小组可行性承诺TKO: Tooling Kick-Off 模具启动会议UG: Unigraphics UG工程绘图造型系统VLE: Vehicle Line Executive 车辆平台负责人VTC: Validation Testing Complete 验证试验完成EWO: Engineering Work Order 工程工作指令