关于建筑地下室后浇带的施工.doc
《关于建筑地下室后浇带的施工.doc》由会员分享,可在线阅读,更多相关《关于建筑地下室后浇带的施工.doc(6页珍藏版)》请在温州文客信息科技有限公司上搜索。
1、关于建筑地下室后浇带的施工【摘 要】改革开放以来,我国建筑工程中的后浇带实施频率及施工中存在的问题显著增加,后浇带是为了因温度、收缩而可能产生有害裂缝而设置的变形缝,经过一段时间后浇形成一个整体。为了解决混凝土变形和温度的影响等问题,采用了一系列的后浇带施工技术,提出相关的问题。同时对地下室后浇带的设置和施工技术展开讨论。 【关键词】后浇带施工技术 问题 措施 【 abstract 】 since Chinas reform and opening up, Chinas construction projects in the implementation of frequency and t
2、he construction of post-cast strip increased significantly, the problems of latter pouring belt is to may produce harmful cracks due to temperature, shrinkage and deformation seam, after a period of time after the water to form a whole. In order to solve the deformation and temperature effect of con
3、crete, adopting a series of construction technology of post-cast strip, put forward related problem. At the same time to set up and the construction technology of basement post-cast strip are discussed. 【 key words 】 the construction technical problems of post-cast strip 中图分类号: TU74 文献标识码: A 文章编号: 一
4、引言 后浇带在建筑施工领域中发挥着巨大的作用,它主要防止混凝土的胀缩引起混凝土开裂。常用于地下室部分、不分缝。对我国建筑质量的发展具有很大的推动作用。但是由于施工企业生产经营具有一定的特殊性,建筑地下室后浇带的施工问题一直存在。因此,需要有明确的计划及详细的处理措施才能解决现场施工人员的困扰,保证施工质量。 后浇带的主要功能 在建筑业中,后浇带的功能体现在方方面面,通过设置后浇带来解决不同期施工结构的沉降差或钢筋混凝土的收缩变形以及混凝土的温度应力等问题,已经普遍存在。 1.一般后浇带、施工缝处理。后浇带的板厚较大,主要通过短木方固定,相对稳定,采用多层板支模,这个流程结束后,需要对支模材料立
5、刻清理,防止杂物干扰,之后对后浇带的上方用多层板覆盖;顶板梁、竖向结构后浇带钢筋不断,两侧用钢板网隔砼。梁上施工缝所有长期裸露于砼外的部分均应用水泥砂浆涂敷防腐。 2.解决沉降差。建筑的结构和基础设施需要形成一个体系,但是在工程实施时需用后浇带对这两部分进行隔离,等到基本结构实施完成或者临近完工的时,需要混凝土的参与,相互凝固形成一个体系。开始进行设计时,需要分析在不同的阶段的受力情况,严格的审核并校对。形成一个体系之后的结构,在计算过程中,需要考虑最终沉降差引起的附加内力。若是地基情况良好,建筑的沉降基本能在施工期间内完成。 3.减小温度收缩影响。混凝土硬结状态下会收缩,对于已建工程结构遇热
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10 文钱
下载 | 加入VIP,畅享折扣下载 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 关于 建筑 地下室 后浇带 施工
链接地址:https://www.wenke99.com/p-1766838.html