1、GLOBALALLIANCEMunichRe CARb) nuclear reaction, nuclear radiation or radioactive contamination:c) wilful act or wilful negligence of the Insured or of his representatives;d) cessation of work whether total or partial.In any action, suit or other proceeding where the Insurers allege that by reason of
2、the provisions of Exclusion a) above any loss, destruction, damage or liability is not covered by this insurance the burden of proving that such loss, destruction, damage or liability is covered shall be upon the Insured.Period of coverThe liability of the insurers shall commence, notwithstanding an
3、y date to the contrary specified in the Schedule, directly upon commencement of work or after the unloading of the items entered in the Schedule at the site. The Insurers liability expires for parts of the insured contract works taken over or put into service.一般除外责任现在这个保险人被保险人已支付的保险费计划的条款,提到排除,规定和条件
4、并在此或批注的保险公司将赔偿被保险人的方式,以下提供的程度。保险公司将不负责赔偿的损失、损害或责任直接或间接导致或加重了战争、入侵、外敌行为、敌对行为(无论是否宣战)、内战、叛乱、革命、起义、兵变、热,罢工,停工,暴乱、军事政变或篡夺宝我们一群人恶意的人或代表或任何政治组织、阴谋、没收、征用的连接,通过征用或毁坏或损坏,任何公共权力的政府的任何法律上或事实上或;核反应,核辐射或放射性污染:故意行为或疏忽被保险人或其代表;停止工作,不论是全部或部分。在任何诉讼,诉讼或其他程序,保险公司声称,通过对排斥的原因)以上规定的任何损失、破坏、损害或责任不属于本保险证明该损失、破坏、损害或责任的证明责任,
5、应在被保险人身上。覆盖期保险人的责任,不论是否有违反附表中指明的日期,均须在工作开始后,或在卸货后的工作开始时,均须在该项规定中的任何日期开始现场日程。保险合同中的部分被保险合同的责任终止或投入使用。At the latest the insurance shall expire on the date specified in the Schedule. Any extensions of the period of insurance are subject to the prior written consent of the Insurers.General conditions1.
6、The due observance and fulfilment of the terms of this Policy in so far as they relate to anything to be done or complied with by the Insured and the truth of the statements and answers in the questionnaire and proposal made by the Insured shall be a condition precedent to any liability of the Insur
7、ers.2. The Schedule and the Section(s) shall be deemed to be incorporated in and form part of this Policy and the expression “this Policy“ wherever used in this contract shall be read as including the Schedule and the Section(s). Any word or expression to which a specific meaning has been attached i
8、n any part of this Policy or of the Schedule or of the Section(s) shall bear such meaning wherever it may appear.3. The Insured shall at his own expense take all reasonable precautions and comply with all reasonable recommendations of the Insurers to prevent loss, damage or liability and comply with
9、 statutory requirements and manufacturers recommendations.4. a) Representatives of the Insurers shall at any reasonable time have the right to inspect and examine the risk and the Insured shall provide the representatives of the Insurers with all details and information necessary for the assessment
10、of the risk.b) The Insured shall immediately notify the Insurers by telegram and in writing of any material change in the risk and cause at his own expense such additional precautions to be taken as circumstances may require, and the scope of cover and/or premium shall, if necessary, be adjusted acc
11、ordingly.No material alteration shall be made or admitted by the Insured whereby the risk is increased, unless the continuance of the insurance is confirmed in writing by the insurers.5. In the event of any occurrence which might give rise to a claim under this Policy, the Insured shalla) immediatel
12、y notify the Insurers by telephone or telegram as well as in writing, giving an indication as to the nature and extent of loss or damage:b) take all steps within his power to minimize the extent of the loss or damage;c) preserve the parts affected and make them available for inspection by a represen
13、tative or surveyor of the insurers;d) furnish all such information and documentary evidence as the Insurers may require;e) inform the police authorities in case of loss or damage due to theft or burglary.m4Al. ALLIANCE -SEGUROSThe Insurers shall not in any case be liable for loss, damage or liabilit
14、y of which no notice has been received by the Insurers within 14 days of its occurrence.Upon notification being given to the Insurers under this condition, the Insured may carry out the repairs or replacement of any minor damage; in all other cases a representative of the Insurers shall have the opp
15、ortunity of inspecting the toss or damage before any repairs or alterations are effected. If a representative of the Insurers does not carry out the inspection within a period of time which could be considered adequate under the circumstances, the Insured is entitled to proceed with the repairs or r
16、eplacement.The liability of the Insurers under this Policy in respect of any item sustaining damage shall cease if said item is not repaired properly without delay.6. The Insured shall at the expense of the Insurers do and concur in doing and permit to be done all such acts and things as may be nece
17、ssary or required by the Insurers in the interest of any rights or remedies, or of obtaining relief or indemnity from parties (other than those insured under this Policy) to which the insurers are or would become entitled or which is or would be subrogated to them upon their paying for or making goo
18、d any loss or damage under this Policy, whether such acts and things are or become necessary or required before or after the Insureds indemnification by the Insurers.7. If any difference arises as to the amount to be paid under this Policy (liability being otherwise admitted), such difference shall
19、be referred to the decision of an arbitrator to be appointed in writing by the parties in difference or, if they cannot agree upon a single arbitrator, to the decision of two arbitrators, one to be appointed in writing by each of the parties within one calendar month after having been required in wr
20、iting so to do by either of the parties, or, in case the arbitrators do not agree, of an umpire to be appointed in writing by the arbitrators before the latter enter upon the reference. The umpire shall sit with the arbitrators and preside at their meetings. The making of an award shall be a conditi
21、on precedent to any right of action against the Insurers.8. If a claim is in any respect fraudulent, or if any false declaration is made or used in support thereof, or if any fraudulent means or devices are used by the Insured or anyone acting on his behalf to obtain any benefit under this Policy, o
22、r if a claim is made and rejected and no action or suit is commenced within three months after such rejection or, in the case of arbitration taking place as provided herein, within three months after the arbitrator or arbitrators or umpire have made their award, all benefit under this Policy shall b
23、e forfeited.9. If at the time any claim arises under the Policy there is any other insurance covering the same loss, damage or liability, the Insurers shall not be liable to pay or contribute more than their rateable proportion of any claim for such loss, damage or liability.Section 1 - Material dam
24、ageThe Insurers hereby agree with the Insured that if at any time during the period of cover the items or any part thereof entered in the Schedule shall suffer any unforeseen and sudden physical loss or damage from any cause, other than those specifically excluded, in a manner necessitating repair o
25、r replacement, the Insurers will indemnify the Insured in respect of such loss or damage as hereinafter provided by payment in cash, replacement or repair (at their own option) up to an amount not exceeding in respect of each of the items specified in the Schedule the sum set opposite thereto and no
26、t exceeding in any one event the limit of indemnity where applicable and not exceeding in all the total sum expressed in the Schedule as insured hereby.Special exclusions to Section 1The Insurers will also reimburse the Insured for the cost of clearance of debris following upon any event giving rise
27、 to a claim under this Policy provided a separate sum therefor has been entered in the Schedule.The Insurers shall not, however, be liable fora) the deductible stated in the Schedule to be borne by the Insured in any one occurrence;b) consequential loss of any kind or description whatsoever includin
28、g penalties, losses due to delay, lack of performance, loss of contract:c) loss or damage due to faulty design;d) the cost of replacement, repair or rectification of defective material and/or workmanship, but this exclusion shall be limited to the items immediately affected and shall not be deemed t
29、o exclude loss of or damage to correctly executed items resulting from an accident due to such defective material and/or workmanship:e) wear and tear, corrosion, oxidation, deterioration due to lack of use and normal atmospheric conditions:f) loss or damage to construction plant, equipment and const
30、ruction machinery due to electrical or mechanical breakdown, failure, breakage or derangement, freezing of coolant or other fluid, defective lubrication or lack of oil or coolant, but if as a consequence of such breakdown or derangement an accident occurs causing external damage, such consequential
31、damage shall be indemnifiable:g) loss of or damage to vehicles licensed for general road use or waterborne vessels or aircraft:h) loss of or damage to files, drawings, accounts, bills, currency, stamps, deeds, evidences of debt, notes, securities, cheques;i) loss or damage discovered only at the tim
32、e of taking an inventory.(ILOBAILIANCE -SEGUROSProvisions applying Memo 1 - Sums insured to Section 1It is a requirement of this insurance that the sums insured stated in the Schedule shall not be less thanfor item 1: the full value of the contract works at the completion of the construction, inclus
33、ive of all materials, wages, freight, customs duties, dues, and materials or items supplied by the Principal:for items 2 and 3: the replacement value of construction plant, equipment and machinery; which shall mean the cost of replacement of the insured items by new items of the same kind and capaci
34、ty:and the insured undertakes to increase or decrease the amounts of insurance in the event of any material fluctuation in wages or prices provided always that such increase or decrease shall take effect only after the same has been recorded in the Policy by the Insurers.If, in the event of loss or
35、damage, it is found that the sums insured are less than the amounts required to be insured, then the amount recoverable by the Insured under this Policy shall be reduced in such proportion as the sums insured bear to the amounts required to be insured. Every object and cost item is subject to this c
36、ondition separately.Memo 2 - Basis of loss settlementIn the event of any loss or damage the basis of any settlement under this Policy shall bea) in the case of damage which can be repaired - the cost of repairs necessary to restore the items to their condition immediately before the occurrence of th
37、e damage less salvage, orb) in the case of a total loss - the actual value of the items immediately before the occurrence of the loss less salvage,however, only to the extent the costs claimed had to be borne by the Insured and to the extent they are included in the sums insured and provided always
38、that the provisions and conditions have been complied with.The insurers will make payments only after being satisfied by production of the necessary bills and documents that the repairs have been effected or replacement has taken place, as the case may be. All damage which can be repaired shall be r
39、epaired, but if the cost of repairing any damage equals or exceeds the value of the items immediately before the occurrence of the damage, the settlement shall be made on the basis provided for in b) above.The cost of any provisional repairs will be borne by the Insurers if such repairs constitute p
40、art of the final repairs and do not increase the total repair expenses.The cost of any alterations, additions and/or improvements shall not be recoverable under this Policy.Memo 3 - Extension of coverExtra charges for overtime, nightwork, work on public holidays, express freight are covered by this
41、insurance only if previously and specially agreed upon in writing.Section 2 - Third party liabilityThe Insurers will indemnify the Insured up to but not exceeding the amounts specified in the Schedule against such sums which the Insured shall become legally liable to pay as damages consequent upona)
42、 accidental bodily injury to or illness of third parties (whether fatal or not).b) accidental loss of or damage to property belonging to third partiesoccurring in direct connection with the construction or erection of the items insured under Section 1 and happening on or in the immediate vicinity of
43、 the site during the period of cover.In respect of a claim for compensation to which the indemnity provided herein applies, the Insurers will in addition indemnify the Insured againsta) all costs and expenses of litigation recovered by any claimant from the Insured, andb) all costs and expenses incu
44、rred with the written consent of the Insurers,provided always that the liability of the Insurers under this Section shall not exceed the limits of indemnity stated in the Schedule.Special exclusions to Section 2The Insurers will not indemnify the Insured in respect of1. the deductible stated in the
45、Schedule to be borne by the Insured in any one occurrence;2. the expenditure incurred in doing or redoing or making good or repairing or replacing anything covered or coverable under Section 1 of this Policy:3. damage to any property or land or building caused by vibration or by the removal or weake
46、ning of support or injury or damage to any person or property occasioned by or resulting from any such damage (unless especially agreed upon by endorsement):4. liability consequent upona) bodily injury to or illness of employees or workmen of the Contractor(s) or the Principal(s) or any other firm c
47、onnected with the project which or part of which is insured under Section 1, or members of their families:b) loss of or damage to property belonging to or held in care, custody or control of the Contractor(s), the Principal(s) or any other firm connected with the project which or part of which is in
48、sured under Section 1, or an employee or workman of one of the aforesaid:c) any accident caused by vehicles licensed for general road use or by waterborne vessels or aircraft:d) any agreement by the Insured to pay any sum by way of indemnity or otherwise unless such liability would have attached als
49、o in the absence of such agreement.Special conditions applying to Section 21. No admission, offer, promise, payment or indemnity shall be made or given by or on behalf of the Insured without the written consent of the Insurers who shall be entitled, if they so desire, to take over and conduct in the name of the Insured the defence or settlement of any ciaim or to prosecute for their own benefit in the name of the Insured any claim for indemnity or damages or otherwise and shall have full discretion in the conduct of any proceedings or in the settlement of any claim and the Insured shall g