1、一、输水洞拆除重建工程1.出口闸室垫层:(4.6+0.57*2+0.4*2)*3*0.1=1.96 m 32.出口闸室侧墙:前墙:3*2.98*0.6-(1.2*1+3.14*0.6*0.6)*0.6=3.97 m 3左侧墙 5*3.28*0.6-(1.3*1.55+0.9*1.2 ) *0.6-0.2*0.2*1.2*2=7.88 m3右侧墙:5*0.6*3.28=9.84 m 3末墙:(3*3.28-1.6*1.78-1.2*1.5)*0.6-0.2*0.2*1.5*2=2.99 m3启闭机梁:1.7*0.2*0.6+2*0.2*0.6=0.44 m3合计:3.97+7.88+9.84+2
2、.99+0.44=25.12 m 33.出口闸底板:6.2*3*0.5+( 0.4+0.8) *0.4/2*2*3+(0.6+1.5)*0.3/2*3=11.69 m34.C25 钢筋砼闸室排架立柱:3.1*(0.4*0.4)*4+ (0.3+0.7 )*0.4/2*2*0.4=2.14 m 3 5.C25 钢筋砼梁板等小体积构件:L1 :0.3 *0.7*3.2+(0.2+0.35)*1/2*0.3*2*2=1.68 m 3 L2 :0.3 *0.7*2.2+(0.2+0.35)*1/2*0.3*2*2=1.26 m 3 L3 :0.3*0.5*2.3*4=1.38 m 3 L4 :(0.3
3、+0.4)*0.6/2*0.3*2+1.8*0.3*0.4=0.35 m 3C25 钢筋砼启闭机板:(0.1+0.15)*1/2*16.2+3*4*0.15=3.83m3检修平台砼板:0.12*3*4=1.44 m 3合计:1.68+1.26+1.38+0.35+3.83+1.44= 9.94m 3建管单位: 监理单位: 施工单位: 7.普通钢模板:113.36+74.71=188.07 m 2(1)出口闸室模板:1.91+14.10+11.90+32.56+34.50+18.39=113.36 m2出口闸室垫层:(4.6+0.4*2+0.57*2+3)*2*0.1=1.91 m 2出口闸室底
4、板:6.2*0.5+( 0.4+0.8) *0.4/2*2+(0.6+1.5 ) *0.3/2*2+0.9*3+1.2*3=14.1 m2出口闸室前墙:(1.8*2.98-1.2*1-3.14*0.6*0.6)*2+0.6*2.98*2+3.14*1.2*0.6=11.90 m2出口闸左侧墙:5.6*3.28+5*3.28-0.9*0.3+0.2*1.2*10+1.55*0.6*2-(1.2*0.9+1.3*1.55 )*2=32.56 m 2出口闸右侧墙:5.6*3.28+5*3.28-0.9*0.3=34.50 m 2出口闸末墙:3*3.28*2+0.2*1.5*10+1.78*0.6+0
5、.6*3.28*2-(1.5*1.2+1.78*1.6 )*2=18.39 m 2(2)进口闸室:15.36+3.18+13.88+11.08+9.2+3.3+18.71=74.71 m 2立柱:0.4*2.4*4*4=15.36 m 2牛腿:0.7*0.4+ (0.3+0.7)*0.4/2*4+0.7*0.4*2+(0.3+0.57)*0.4*2=3.18 m 2L1: 4*0.55*2+(0.1+0.25)*1/2*4+(0.1*0.3+1.01*0.3+0.35*0.3)*2+3.2*0.3=6.94 m 26.94*2=13.88 m2建管单位: 监理单位: 施工单位: L2:3*0.
6、55*2+( 0.1+0.25) *1/2*4+(0.1*0.3+1.01*0.3+0.35*0.3 )*2+2.2*0.3=5.54 m25.54*2=11.08 m2L3:( 2.3*0.35*2+2.3*0.3)*4=9.20 m 2L4: 2.2*0.3+3*0.4*2+0.3*0.4*2=3.30 m2启闭机板:0.1*(6*2+5+3.2)+1*16.2+0.3*0.4*2+(0.1+0.15)*1/2*2=18.71 m 28.钢筋制作及安装:规格 长度 根数 总长 重量部位 编号mm cm 根 m Kg 备注 20 515 32 164.80 406.40立柱 6 140 92
7、 447.00 99.23共 4 根 14 288 10 28.80 34.79 12 258 10 25.80 22.91牛腿 6 140-220 12 24.24 5.38共 2 个合计 568.71规格 长度 根数 总长 重量部位 编号mm cm 根 m Kg 合计 16 220 49 107.80 170.11 8 115 28 32.20 12.72 8 125 14 17.50 6.91 8 125 4 5.00 1.98 25 385 2 7.70 29.65 25 55 10 5.50 21.18检修平台 25 210 17 35.70 137.45盖板 16 75 22 16
8、.50 26.04406.0414 130 36 46.80 56.53钢筋滤网16 180 26 46.80 73.81130.34建管单位: 监理单位: 施工单位: 部位 编号 直径(mm) 单根长(cm) 总根数 总长(m) 重量(kg) 合计(kg) 18 611 4 24.44 48.83 12 613 2 12.26 10.89 16 411 4 16.44 25.94 8 272 22 59.84 23.64 8 104-74 10 8.90 3.52 8 35 22 7.70 3.04L1 18 402 4 16.08 25.37141.23 18 511 4 20.44 40
9、.84 12 513 2 10.26 9.11 16 311 4 12.44 19.63 8 272 16 43.52 17.19 8 104-74 10 5.90 2.33L2 8 35 16 5.60 2.2191.31 18 429 3 12.87 25.71L3 14 429 4 17.16 20.73 55.92 8 150 16 24.00 9.48 16 347 3 10.41 16.43 20 347 3 10.41 25.67 L4 8 132 21 27.72 10.9553.05合 计 141.23* 2+91.31*2+55.92*4+53.05=741.81kg规格
10、长度 根数 总长 重量部位 编号mm cm 根 m Kg 合计 8 405 16 64.8 25.60 8 305 21 64.05 25.30 8 505(165) 34(12) 191.50 75.64 8 605(505) 24(11) 200.75 79.30启闭机层 8 310 28 86.8 34.29240.13建管单位: 监理单位: 施工单位: 部位 编号 直径(mm) 单根长(cm) 总根数 总长(m) 重量(kg) 合计(kg) 16 632 34 214.88 339.08 12 312 70 218.40 193.94出口闸室 底板 16 192 34 65.28 10
11、3.01636.03 16 390 54 210.60 332.33f 16 235 8 18.80 29.67e 16 115 10 11.50 18.15 12 632 4 25.28 22.45e 12 355 16 53.60 47.60出口闸室左侧墙f 12 159 16 25.44 22.59548.40g 12 375 12 45.00 39.96h 12 179 12 21.48 19.07 10 112 24 26.88 16.58 16 390 64 249.60 393.87右侧墙 12 632 32 202.24 179.59 16 390 24 93.60 147.7
12、0a 16 10 7.74 12.21b 16 132 32 42.24 66.65a 16 241 14 33.74 29.96b 12 390 36 140.40 124.68 12 241 2 4.82 2.97前墙 10 132 2 2.64 4.17961.80 16 390 20 78.00 123.08c 16 102 10 10.20 16.10d 16 222 8 17.76 28.03c 12 82 40 32.80 29.13d 12 102 24 24.48 21.74后墙 10 112 24 26.88 16.58234.66 16 212(182) 4(4) 15.
13、76 24.87 12 212(182) 4(4) 15.76 13.99启闭机梁 10 141 20 28.20 17.4056.26合 计 2437.15Kg合计:568.71+406.04+130.34+141.23+91.31+55.92+53.05+240.13+2437.15=4123.88 Kg4.新建操作室:3.6*2.6+(1.08*6*2+2.84*1.08*2)/2=18.91 m 25. 15 钢管排气孔:360kg建管单位: 监理单位: 施工单位: 二、新建输水洞工作桥工程1.浆砌石桥台:2.1*0.6*2.6+(0.9+1.3 )*1/2*1.8=5.26 m32.
14、钢筋砼台帽:(0.4*0.9+0.4*0.32)*1.8=0.88 m 33.C10 垫层:3.2*1.8*0.1=0.58 m34.钢筋砼桥板:6.48*1.8*0.32*2=7.46 m 35.钢筋砼排架:立柱部分:0.3*0.4*2.6*2=0.62 m 3牛腿部分:0.6*0.4+(0.4+0.6 )*0.2/2*0.3*2=0.20 m 3排架柱梁:0.4*0.4*1.2+0.2*0.2/2*0.4*2=0.21 m 3合计:0.62+0.20+0.21=1.03 m 36 钢筋制作安装:部位 编号 直径(mm) 单根长(cm) 总根数 总长(m) 重量(kg) 合计(kg) 20
15、403 16 64.48 159.01立柱 8 122 38 46.36 18.31177.32 20 193 8 15.44 38.08 8 142 10 14.20 5.61 14 130 4 5.20 6.28 16 245 6 14.70 23.20顶梁 8 73 8 5.84 2.3175.48 10 173 21 36.33 22.42基础 14 313 12 37.56 45.3767.79 18 661 38 251.18 501.86桥板 10 409 66 269.94 539.341041.20 8 184 6 11.04 4.36台帽 8 308 10 30.8 12.
16、1716.53合 计 1378.32kg建管单位: 监理单位: 施工单位: 7.普通平面模板:台帽:0.4*1.8+0.72*1.8+0.32*1.8+(0.4*0.9+0.32*0.4)*2=3.58 m 2桥板:(6.5*1.8+0.32*6.5*2)*2=31.72 m2垫层:(3.2*0.1+1.8*0.1)*2=1 m2柱墩:(3*0.35+1.6*0.35)*2+ (2.4*0.35+1*0.35 )*2=5.60 m2排架柱:(0.3*2+0.4*2)*2.6*2=7.28 m20.6*0.4+( 0.4+0.6) *0.2/2*2+0.4*0.3+0.3*0.22+(0.4+0
17、.6)*0.1/2*4=1.64 m 20.4*1.2*2+0.2*0.2/2*4+0.8*0.4+0.28*0.4*2=1.58 m27.28+1.64+1.58=10.50 m2模板合计:3.58+31.72+1+5.60+10.50=52.40 m 28.三毡四油:0.5*1.8+0.32*1.8+0.32*1.8+0.6*1.8=3.13 m 29.工作桥汉白玉栏杆:25.12m10.钢管栏杆:建管单位: 监理单位: 施工单位: 三、溢洪道交通桥工程1.一般石方开挖运输:桥墩基础石方开挖:(7.94+7.64)*0.5/2*3.09*2=24.07 m 32.坡面石方开挖运输:32.6
18、6+14.98=47.64 m 3左岸开挖:(2.35+0.85)*3/2*5.31+0.9*3/2*5.31=32.66m 3右岸开挖:2.6*2.17/2*5.31=14.98 m 33.C20 砼桥墩基础:(2.09+2.39 )*0.5/2*( 7.34+7.64)/2*2=16.78 m 3建管单位: 监理单位: 施工单位: 4. C20 砼桥墩、桥台:40.85+41.98=82.83 m 3(3.14*0.65*0.65+5.25*1.29+3.14*0.5*0.5+5.25*1)/2*2.89*2=40.85 m3(1.1+2.15 )*2.1/2*5.31+0.9*0.6*5
19、.31*2=41.98m 35.C25 钢筋砼台帽:2.32+2.80=5.12 m 3桥墩处:(3.14*0.55*0.55+5.25*1.1)*0.4-4.63*1.1*0.3 *2=2.32 m3桥台处:(0.6*5.31*0.4+0.3*0.35*0.6*2)*2=2.80 m 36.C30 钢筋砼桥板:16.74+20.07=36.81 m 3 中板:(0.85+0.79)*0.25/2+(0.79+0.99)*0.05/2+0.99*0.1*7.96*6=16.74 m3 边板:(0.1+0.15)*0.25/2+(1.05+0.895)*0.25/2+(0.895+0.995 )
20、*0.15/2 *7.96*6=20.07m 37.C25 钢筋砼路沿:0.3*0.3*8*6-30*(0.14*0.1+0.18*0.14 )/2*0.2=4.20 m38.C30 钢筋砼铺装层:0.382*6+0.191*6+(0.1+0.08)*1.95/2*2*24=11.86m 39.25 钢筋砼栏杆制按:1.03+0.6=1.63 m 3扶手:0.12*0.09*1.98*48=1.03 m 3立柱:0.8*0.18*0.14+0.2*(0.14*0.1+0.18*0.14 )/2-0.13*0.09*0.14*2*30=0.6 m3建管单位: 监理单位: 施工单位: 10.钢筋制作安装: