度会计继续教育考试答案题库.doc

上传人:坚持 文档编号:3250793 上传时间:2019-05-27 格式:DOC 页数:17 大小:77.50KB
下载 相关 举报
度会计继续教育考试答案题库.doc_第1页
第1页 / 共17页
度会计继续教育考试答案题库.doc_第2页
第2页 / 共17页
度会计继续教育考试答案题库.doc_第3页
第3页 / 共17页
度会计继续教育考试答案题库.doc_第4页
第4页 / 共17页
度会计继续教育考试答案题库.doc_第5页
第5页 / 共17页
点击查看更多>>
资源描述

1、Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Asse

2、mbly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve,

3、smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.8

4、15 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No pe

5、rsonal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207

6、 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions perfo

7、rmance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduc

8、tion over the same period a year earlier. Major achievements: first, we should adhere to the two “management system“ basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two “management system“ for improvemen

9、t. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management ne

10、twork role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supe

11、rvision of production safety and the Olympic Games and otheractivities, comprehensive and tamping Safety Foundation . Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year complete

12、d the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and techn

13、ological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modific

14、ation of coal mill 5 key technological transformation projects, group health is improved. -Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed m

15、otor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual p

16、roduction output of 0.25%. “Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies“ project, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 63

17、0MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the compan

18、y was named “China power information technology benchmarking enterprises.“ -Repair and maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS+ system, and implements mainten

19、ance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance,

20、project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-sav

21、ing projects. Second, we should adhere to “three“ on the economic benefits of improving, outreach2014 年会计继续教育题库课程:企业内部控制配套指引、企业内部控制 1考试时每个题只需按编号找到答案即可,简单方便,保证 90 分。一、单选3003 企业货币资金的“内部牵制”原则是指() 。 答案:C3004 采购与付款业务控制的最关键步骤是()答案:C3006 销货的收款部门不管设在那里,都要有()统一部门管理。答案:B3009 企业规定报销费用 300 元以下部门负责人签字报销 300 元以上

22、1000 元以下副总经理签字报销 1000 元以上总经理签字 10 万元以上开支经理办公会议决定 100 万元以上董事会决定,这在内部控制中叫做什么() 。 答案:C3010 商业企业发放 “购物券”进行销售,违反下列那项结算纪律()答案:D3013 支票结算起点应该是() 。答案:B3014 国务院 现金结算管理办法规定的零星支出可以用现金结算金额为() 。答案:DDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Co

23、nference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for g

24、uidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardiz

25、ed, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh

26、. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental polluti

27、on accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment

28、 at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust r

29、emoval efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two “management system

30、“ basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two “management system“ for improvement. Focus on promoting the power of the company management system and the application and implementation of the safe

31、ty loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, s

32、trengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and otheractivities, comprehensive and tamping Safety Foundation

33、 . Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 Gene

34、ral problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of c

35、irculating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. -Science and technology i

36、nnovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production

37、 level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. “Large-scale coal-fired power plant flue gas desulfurization, denitrification complete d

38、evelopment and application of key technologies“ project, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of

39、turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named “China power information technology benchmarking enterprises.“ -Repair and maintenance has improved fur

40、ther. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS+ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of

41、 maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mill

42、s, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to “three“ on the economic benefits of improving, outreach3015 企业内部控制的内容是否包括

43、财务会计报告真实可靠() 。 答案:B3018 下列那项支出不符合现金管理办法的法规规定() 。 答案:C3680 拨货计价实物负责制实质上是一种答案:A5849 为确保企业内控规范体系平稳顺利实施,财政部等五部门制定了实施时间表:自 ( ) 起首先在境内外同时上市的公司施行,自 2012 年 1 月 1 日起扩大到在上海证券交易所、深圳证券交易所主板上市的公司施行;在此基础上,择机在中小板和创业板上市公司施行。答案:A5850 企业的组织架构,是指企业的( ) ,以及管理机构设置、人员编制、职责权限划分等制度安排。答案:ABC5853 企业的决策层第一要务就是( ) ,制定长期战略规划。答案

44、:C5857 决定企业素质的最重要部分是( ) ,一直是企业作不完的功课,研究不尽的课题。答案:D5858 企业应该制定薪酬制度,定岗定薪,使员工的劳动贡献与薪酬协调, ( ) ,体现效率优先的薪酬政策。答案:A5860 企业依法履行社会责任,就是实现企业与自然、社会协调发展,为自己保Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012,

45、 careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the sci

46、entific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a

47、harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceedi

48、ng sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive

49、 years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育教学资料库 > 试题真题

Copyright © 2018-2021 Wenke99.com All rights reserved

工信部备案号浙ICP备20026746号-2  

公安局备案号:浙公网安备33038302330469号

本站为C2C交文档易平台,即用户上传的文档直接卖给下载用户,本站只是网络服务中间平台,所有原创文档下载所得归上传人所有,若您发现上传作品侵犯了您的权利,请立刻联系网站客服并提供证据,平台将在3个工作日内予以改正。