CASS工艺脱氮除磷改造工程摘要:在原CASS工艺设计中,生物池主要分为生物选择器和主反应区,工艺运行周期为进水1小时、曝气1小时、沉淀1小时、滗水1小时,该工艺运行情况下出水TN、TP无法达到城镇排水标准,脱氮除磷效果不理想。为了进一步的进行脱氮除磷,利用小试SBR装置对工艺进行模拟,运行周期进行调整为6小时,进水50分钟后开始搅拌,搅拌1小时,曝气2.25h,沉淀0.5h,排水1.5h。模拟结果显示改造后出水可以稳定达到出水标准。关键词:CASS工艺;脱氮除磷;改造;模拟;Abstract: in the original CASS process design, the main pool is divided into biological selector and the main reaction zone, the process cycle for 1 hour, 1 hour aeration, the water precipitation for 1 hour, decantation water for 1 hour, the proce