阿曼机组故障原因分析及建议.doc

上传人:创****公 文档编号:715984 上传时间:2018-10-29 格式:DOC 页数:2 大小:189KB
下载 相关 举报
阿曼机组故障原因分析及建议.doc_第1页
第1页 / 共2页
阿曼机组故障原因分析及建议.doc_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、RODLESS PUMPS,INC. No. 678, Huanghe Road, Dongying, Shandong Prov, P. R. ChinaTel: 86-546-8708237,8708463, 8772069 Fax: 86-546-8225914E-mail: http:/ Submersible Screw Pump Well Data FormA Well Data1.Well number and field name: Date: 2.Well site(Province, city or other):3.Equipment: New( )or Design

2、Again( )4.Oil Reservoir:5.Reservoir Type(sandstone, limy sand, or other)6.*API Casing: O.D.: Wall Thickness : From ft to ft7.*Liner O.D.: Wall Thickness: From ft to ft8.*Other Specific Dimension I.D.: From ft to ft9.*Naked Hole: 10.*The Total Depth: ft The Manual Downhole Depth: ft11.*Perforation Se

3、ction: ft From ft to ft 12.*The Well-head Equipment Type and Dimension:13. *API Tubing O.D.: Screw Thread: Grade: B Reservoir Data(gained from well testing and producing data)1.*Existing Production: Fluid: BPD, Oil: BPD, Water: BPD Swabbing( ) Artesian Flow( ) 2. Static Pressure at The Mid Oil Reser

4、voir Psi, at ft3. Flowing Pressure at The Mid Oil Reservoir Psi,at BPD Psiat BPD4. G&O Ratio: m3/m35.* Water cut: %6.*API: API Density: Relative Density: RODLESS PUMPS,INC. No. 678, Huanghe Road, Dongying, Shandong Prov, P. R. ChinaTel: 86-546-8708237,8708463, 8772069 Fax: 86-546-8225914E-mail: htt

5、p:/ 7.* Water Relative Density: 8.* Gas Relative Density: 9.* Temperature at The Mid Oil Reservoir F, Depth ft 10.*Oil Viscosity (1) mPa.s or SSU(The Temperature is F)(2) mPa.s or SSU(The Temperature is F)11. Pressure, Volume, Temperature Data Solution G&O Ratio , Formation Volume Factor , at Psi So

6、lution G&O Ratio , Formation Volume Factor , at PsiSolution G&O Ratio , Formation Volume Factor , at PsiSolution G&O Ratio , Formation Volume Factor , at Psi12.* Saturation Pressure PsiC Technical Requirements of Specification Selection1.* Predicting Production: Liquid: BPD, Oil: BPD, Water: BPD 2.

7、Predicting Pump Setting Depth (at pump intake): ft 3. Predicting Intake Pressure: Psi4. Required Well-head Pressure: Psi5. Gas Volume Through Pump: %(of total gas volume)6. Power Supply: V Hz7. Casing Pressure: Psi8. Deviated Well:9. Special Problem: Sand content( ) Rust( )Corrosion( )Wax( )H2S( ) CO2( )Notes:Recorder: Date: * indicates these data must be provided

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 实用文档资料库 > 规章制度

Copyright © 2018-2021 Wenke99.com All rights reserved

工信部备案号浙ICP备20026746号-2  

公安局备案号:浙公网安备33038302330469号

本站为C2C交文档易平台,即用户上传的文档直接卖给下载用户,本站只是网络服务中间平台,所有原创文档下载所得归上传人所有,若您发现上传作品侵犯了您的权利,请立刻联系网站客服并提供证据,平台将在3个工作日内予以改正。