玩具车翻斗注塑模具设计-毕业设计开题报告书.doc

上传人:龙*** 文档编号:1939495 上传时间:2019-03-24 格式:DOC 页数:5 大小:61KB
下载 相关 举报
玩具车翻斗注塑模具设计-毕业设计开题报告书.doc_第1页
第1页 / 共5页
玩具车翻斗注塑模具设计-毕业设计开题报告书.doc_第2页
第2页 / 共5页
玩具车翻斗注塑模具设计-毕业设计开题报告书.doc_第3页
第3页 / 共5页
玩具车翻斗注塑模具设计-毕业设计开题报告书.doc_第4页
第4页 / 共5页
玩具车翻斗注塑模具设计-毕业设计开题报告书.doc_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Asse

2、mbly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve,

3、smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.8

4、15 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No pe

5、rsonal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207

6、 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions perfo

7、rmance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduc

8、tion over the same period a year earlier. Major achievements: first, we should adhere to the two “management system“ basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two “management system“ for improvemen

9、t. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management ne

10、twork role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supe

11、rvision of production safety and the Olympic Games and otheractivities, comprehensive and tamping Safety Foundation . Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year complete

12、d the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and techn

13、ological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modific

14、ation of coal mill 5 key technological transformation projects, group health is improved. -Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed m

15、otor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual p

16、roduction output of 0.25%. “Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies“ project, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 63

17、0MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the compan

18、y was named “China power information technology benchmarking enterprises.“ -Repair and maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS+ system, and implements mainten

19、ance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance,

20、project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-sav

21、ing projects. Second, we should adhere to “three“ on the economic benefits of improving, outreach毕业设计开题报告书题目: 玩具车翻斗注塑模具设计 系别: 机械工程系 班级: 10 模具 11 姓名: 彭威威 学号: 指导教师: 王新蒙 唐山工业职业技术学院Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference

22、 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance,

23、 comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and

24、the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales

25、totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accid

26、ents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grad

27、e four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal e

28、fficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two “management system“ basis,

29、 strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two “management system“ for improvement. Focus on promoting the power of the company management system and the application and implementation of the safety loop

30、five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthe

31、ning the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and otheractivities, comprehensive and tamping Safety Foundation . Troub

32、leshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General prob

33、lems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulati

34、ng water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. -Science and technology innovatio

35、n is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level o

36、f lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. “Large-scale coal-fired power plant flue gas desulfurization, denitrification complete developme

37、nt and application of key technologies“ project, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine

38、driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named “China power information technology benchmarking enterprises.“ -Repair and maintenance has improved further. Mo

39、dify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS+ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of mainten

40、ance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maint

41、enance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to “three“ on the economic benefits of improving, outreach毕业设计开题报告填写要求与格式一、开题报告的内容要求

42、开题报告在指导教师指导下,由学生本人在毕业设计(论文、创作)工作前期内完成,经指导教师签署意见及教研室主任(可委托专业带头人)审查后生效。二、开题报告的填写要求1、开题报告必须 采用计算机输入、打印 A4 纸,于左侧装订。字号行距要求:4 号字体,22 磅行距。2.学生查阅参考文献不应少于 3 篇(不包括辞典,手册)3.开题报告一式两份,学生自留一份,交指导教师一份,提交时间见本系当前学期的毕业设计(论文、创作)工作计划 。4.有关年月日等日期的填写,一律用阿拉伯数字书写,如 2005 年 5 月 16 日或 2005-5-16。5.按以下格式列出参考文献:期刊杂志类:序号 ,作者, 文章题目

43、 ,期刊名 , 年份 , 期数, 页码图书类: 序号, 书名, 出版单位 ,年份,页码网上资料类:序号,作者,文章名,网址,日期Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Her

44、e, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards,

45、focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are

46、 as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 mil

47、lion kWh. -Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: to

48、tal profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power c

49、onsumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 学术论文资料库 > 毕业论文

Copyright © 2018-2021 Wenke99.com All rights reserved

工信部备案号浙ICP备20026746号-2  

公安局备案号:浙公网安备33038302330469号

本站为C2C交文档易平台,即用户上传的文档直接卖给下载用户,本站只是网络服务中间平台,所有原创文档下载所得归上传人所有,若您发现上传作品侵犯了您的权利,请立刻联系网站客服并提供证据,平台将在3个工作日内予以改正。